Magee-Womens Hospital 4th Fl Pathology Lab

Project Scope

Wet Lab Renovation
This renovation consisted of two offices, grossing and expanded lab spaces, and a formalin disposal wet lab. The scope of work included new finishes, lab casework, and grossing lab stations within the circulation rooms.
RTU Crane Lift
A new RTU was installed on the sixth floor MEP corridor for direct ventilation for the grossing lab and formalin disposal lab. The install required a crane lift plan and was brought in 10 pieces to accommodate access. The ductwork was placed through a new shaft created from the sixth to the fourth floor.
Night Shift
Work was performed during night shifts to minimize disruption to the surrounding 24/7 active lab. ICRA Level IV protocols were strictly maintained and closely monitored in the corridor, which remained in use for active lab deliveries.

Project Gallery

Project Details

Owner Confidential
Architect Stantec
Size 3,000 SF
Location Pittsburgh, PA

Markets

Abstract graphic design featuring three nested V-shaped chevrons in shades of gray and orange.
Years in the Industry

Magee-Womens Hospital 4th Fl Pathology Lab