Holistic Industries Cultivation Facility Beaver

Project Scope

Adaptive Reuse
This adaptive reuse project transformed a former automotive parts warehouse into a new cannabis cultivation facility.
Grow Rooms
The facility consists of flower, veg, MOM, prop, dry, trim, vault, extraction lab, locker rooms, and cafeteria. Work included installation of fertigation/RO/water treatment systems, CO distribution, LED grow lighting, benching systems, extraction, explosion-proof rooms, and air circulation equipment.
Electrical
Rycon completed all low voltage and communication wiring for the mechanical, electrical, IT, and security systems. Coordination was required with the Owner’s BMS vendor for all low voltage wiring.

Project Gallery

Project Details

Owners
  • Holistic Industries
  • Franklin Street
  • Vega Strategic Ventures
Architect MJ12 Design Studio
Size 62,000 SF
Location Beaver, WV
Abstract graphic design featuring three nested V-shaped chevrons in shades of gray and orange.
Years in the Industry

Holistic Industries Cultivation Facility Beaver