Equitrans Midstream Gas Control Room

Project Scope

Design-Build
This renovation was delivered using the Design-Build method to create a 24/7 Gas Control Center for monitoring the natural gas pipeline system.
HVAC System
The scope included a new entry and controls hallway, demo, installation of a dedicated HVAC system separate from the building’s system, offices, fitness room, and conference room. Additional work involved fire protection, AV integration, decorative cloud ceilings, and a raised flooring system.
Craftworks USA
Rycon’s Craftworks USA fabricated custom casework throughout the space.

Project Gallery

Project Details

Owner Equitrans Midstream
Architect Stantec
Size 4,000 SF
Location Canonsburg, PA

Markets

Abstract graphic design featuring three nested V-shaped chevrons in shades of gray and orange.
Years in the Industry

Equitrans Midstream Gas Control Room