(3) PEMB Structures
The project included a Central Maintenance Building, Police Evidence Storage Building, and Sanitation Garage, all pre-engineered metal buildings on concrete piers and slabs with CMU walls. Site work included utilities, grading, parking, an emergency generator, and fueling station coordination.
Vehicle Service
The 89,500 sf Maintenance Building was designated for fleet service, parking, and admin offices. The main garage features 14 overhead doors, service bays with lifts, mezzanine, and welding area. A second aux garage was built for parking with three overhead doors. An 11,300 sf office includes a conference room, communications area, break room, restrooms, carpentry shop, paint shop, and a decontamination room.
Police & Sanitation Buildings
The Police Evidence Storage Building is a 10,700 sf facility with an evidence office, parking for 28 vehicles, and two overhead doors. The 10,500 sf Sanitation Parking Building provides enclosed parking bays for up to 16 sanitation trucks.

Project Gallery

Project Details

Owner City of Elyria
Architects
  • Strollo Architects
  • A. Neider Architecture
Size 110,700 SF
Location Elyria, OH