Downrite Engineering Gulf Coast Office

Project Scope

Ground-Up
This new two-story structure includes concrete footers and slab, CMU walls with epoxy and stucco finishes, concrete tie beams, storefront systems, pre-engineered wood trusses, hollow-core precast floors, metal roof, and MEPs including exhaust fans, condensing units, AHUs, and oil separators.
Maintenance Bays
The interior features offices, restrooms, lobby, and parts storage on the first floor, with offices, break room, and a mezzanine on the upper level. A central high-bay area provides two-story maintenance bays with six roll-up doors.
Site Work
Site work included a CMU dumpster enclosure with slat panel doors, concrete slab, parking, utilities, and landscaping.

Project Gallery

Project Details

Owner Downrite Engineering
Architect Titsch Architecture
Size 5,000 SF
Location Fort Myers, FL

Tags

Abstract graphic design featuring three nested V-shaped chevrons in shades of gray and orange.
Years in the Industry

Downrite Engineering Gulf Coast Office