Steel Valley Elementary William V. Campbell Campus

Project Scope

Ground-Up
The new two-story structure features a combination of shallow and deep foundations, structural steel framing, concrete slabs, cold-formed metal framing, CMU partitions, and EPDM roofing. Exterior finishes include brick veneer, composite aluminum panels, aluminum storefront, and curtainwall systems.
Gym/Storm Shelter
The building features classrooms, educational support space, admin space, cafeteria, media center, and gymnasium/storm shelter area for the 970 students.
Extensive Site Work
Site work included asbestos removal, demolition of an existing building, earth moving, paving, connections to public roadways, utility systems, stormwater management system, underground retention, outdoor play area, and landscaping.

Project Gallery

Project Details

Owner Steel Valley School District
Architect DRAW Collective
Size 150,000 SF
Location Munhall, PA

Markets

Abstract graphic design featuring three nested V-shaped chevrons in shades of gray and orange.
Years in the Industry

Steel Valley Elementary William V. Campbell Campus