SmartStop Self Storage Hendersonville

Project Scope

Multi-Building
The project consisted of (2) new temperature-controlled buildings and (1) drive-up non-temperature controlled building constructed on an existing SmartStop site. The buildings were delivered using a sequenced construction approach.
PEMB
The scope included concrete foundations and slabs, masonry, structural steel, and pre-engineered metal building (PEMB) construction. Additional work encompassed rough carpentry, metal roofing and wall panels, EIFS, insulation, door and overhead door systems, storefront glazing, metal framing, drywall, sealed concrete floors, canopies, and infrastructure.
Retaining Walls
Site work included selective demolition, grading, utility installations, erosion control, retaining walls, asphalt paving and striping, curb and gutter installation, and landscaping.

Project Gallery

Project Details

Owner SmartStop Self Storage
Architect Dean Architects, PLLC
Size 85,100 SF
Location Hendersonville, NC

Markets

Abstract graphic design featuring three nested V-shaped chevrons in shades of gray and orange.
Years in the Industry

SmartStop Self Storage Hendersonville