Enbridge Gas Ohio Facilities

8
Projects
8 Projects

Project Scope

Ground-Up PEMB
Two projects involved 6,900 sf PEMB warehouses with concrete foundations, masonry knee walls, site work, stormwater systems, heaters, and lighting. Another added a CMU drum storage building with epoxy flooring and overhead coiling door.
Renovations
Several renovations upgraded the operations, compressor, and well buildings with new roofs, siding, doors, windows, lighting, HVAC, epoxy floors, ceilings, and utility improvements.
Occupied Facility
One project involved a phased renovation of a 23,000 sf mission-critical shop completed during occupancy. Upgrades included walls, ceilings, finishes, MEP systems, underground oil interceptor, and vehicle wash. Renovated spaces included training rooms, warehouse, garage, locker rooms, and offices.

Project Gallery

Project Details

Owner Enbridge Gas
Architects
  • AECOM
  • Four Points
Total Size 45,400 SF
Locations Ohio
Abstract graphic design featuring three nested V-shaped chevrons in shades of gray and orange.
Years in the Industry

Enbridge Gas Ohio Facilities