Industrial Manufacturing Plant Addition & Renovation

Project Scope

Phased
Rycon completed the project in three phases, which included two PEMB additions and renovating portions of the existing operational plant. Work involved a new steel-framed connector building, installation of an electrical duct bank for a new 35kV service, and construction of a new loading dock.
PEMB
The two PEMB shells featured structural steel frames with insulated metal panel exteriors. Interior build-outs included high-voltage electrical service, chloride exhaust ductwork, bulk gas tanks and piping, chemical fire suppression systems, diesel generators, a cooling tower, offices, and orbitally welded stainless steel piping for ultra-high purity gas.
Operational Facility
Renovations occurred while the plant remained operational to support new equipment, improve production efficiency, and upgrade MEP systems. Enhancements focused on improving employee comfort.

Project Gallery

Project Details

Owner Confidential
Architect H.F. Lenz
Size 121,900 SF
Location Orwell, OH