El Dorado Furniture Distribution Center

Project Scope

Ground-Up
This project consisted of a new concrete masonry unit (CMU) addition with eight loading docks.
Expansion
The existing forklift service platform area was expanded and enclosed with new concrete walls. A new 2,200 sf forklift service platform was relocated to the south of the new expansion.
Repeat Client
Rycon has completed additional construction services at an El Dorado Furniture retail location.

Project Gallery

Project Details

Owner El Dorado Furniture
Architect Stiles Architecture Group
Size 8,600 SF
Location Miami Gardens, FL

Tags

Abstract graphic design featuring three nested V-shaped chevrons in shades of gray and orange.
Years in the Industry

El Dorado Furniture Distribution Center