Allegheny Health Network West Penn Hospital Deaerator Tank

Project Scope

Infrastructure
The project involved replacing the deaerator (DA) tank within the West Penn Hospital Service Building. The existing unit had reached the end of its service life, and its replacement was critical to maintaining hospital operations. The scope included full removal of the existing tank, installation of new piping and valves, a new flash tank, and updated control systems.
Roof & Pipe Upgrades
Additional work included cutting and patching the roof for new vent piping, as well as painting all newly installed piping.
Boiler Upgrades
Economizers were installed on all three existing boilers, which also required re-tubing and new control systems to improve efficiency and performance.

Project Gallery

Project Details

Owner Allegheny Health Network
Architect DesignGroup
Location Pittsburgh, PA

Markets

Tags

Abstract graphic design featuring three nested V-shaped chevrons in shades of gray and orange.
Years in the Industry

Allegheny Health Network West Penn Hospital Deaerator Tank