Crane Lift at 75 Hopper Place

Projects
5y ago
A tall yellow crane lifting a modular unit onto the roof of a modern, multi-story office building under construction.

On a hazy day in Pittsburgh, PA, a crane lift occurred at the new 75 Hopper Place building within the Strip District’s 3 Crossings Development. Multiple RTU’s, weighing about 30,000 pounds each, were hoisted to the top of the five-story structure. The Hranec Corporation team did an excellent job with the lift, and we enjoyed working with them. Keep an eye out for the final product coming soon!

Abstract graphic design featuring three nested V-shaped chevrons in shades of gray and orange.
Years in the Industry

Crane Lift at 75 Hopper Place