Two new tilt-up industrial warehouse structures were constructed to mirror each other with a centralized concrete truck court. The structures include a single ply TPO roofing system, concrete slab over a 10 ml vapor barrier, and steel columns. Each 160,400 sq. ft. 32-0’ clear warehouse has offices and a utility room. Other scope items included site work, pump station, discharge wells, fencing, retaining wall, irrigation, overhead doors, storefront, canopies, dock canopies, dock equipment, fire sprinkler system/alarm, plumbing, HVAC, and electrical.
Projects
Xebec Multi-Tenant Office & Industrial Warehouses
Explore
Project Info
Xebec Realty
Pereria Architects, PA
320,800 SF
Construction Manager at-Risk
Miami
, FL
Tags
Featured