Projects

University of Pittsburgh Hillman Library Phases 2-4

Scope

Rycon held the general trades contract for three phases of the LEED Silver Hillman Library overhaul. The work included renovation of ground level, first through third floors, and a 15,500 sq. ft. three-story entry addition.

The overall scope highlights include a new stair tower addition, replacement of the exterior raised plaza, reconfigurations, mechanical system upgrades, abatement, new efficient lighting, distribution of power/wireless signal, replacement of windows and roof, new exterior accessible ramp, new elevator, and modernization of existing elevators. A three-story entry was added to provide a grand entrance, handicapped access, and new monumental stair.

The library features space for archives and special collections, offices, maker space, data lab, group study, workrooms, and curated collections.

Explore

Project Info

University of Pittsburgh

GBBN Architects

170,000 SF

General Contractor

Pittsburgh

, PA
Scroll to Top