Projects

Pittsburgh International Airport Multi-Modal Complex

Scope

Rycon was the successful low bidder on three (3) bid packages as part of the $1.57 billion terminal modernization program. This includes a new five-story multi-level parking garage and including rental car parking, customer service areas, quick turnaround facilities and ready/return, and 3,500 public parking spaces. The second $26.1 million package includes new surface parking with 2,700 stalls and additional site work while the large third package is the terminal interiors.

Overall, the work includes site grading, storm collection system modification and installation, utility (water, gas, electric, telecommunications) installation, paving, and roadway/parking lot lighting as well as excavation and backfill, bridge and roadways, deep foundations, foundation concrete, slab-on-grade concrete, superstructure concrete, post-tensioning concrete, slab-on-deck concrete, precast structural concrete, concrete masonry unit, structural steel, rough carpentry, thermal/moisture protection, openings, exterior envelope, finishes, specialties, equipment, and furnishings.

A partnership with OSHA encourages joint cooperation between all parties to foster a safe work environment. The contract also required an OCIP insurance policy.

The parking garage was designed utilizing BIM and will be built to achieve both Parksmart Certification and LEED Certification.

Rycon is self-performing concrete and carpentry installation.

Explore

Project Info

Allegheny County Airport Authority

Michael Baker International

2.4 Million SF

General Contractor

Pittsburgh

, PA
Scroll to Top