This 500 ft. long, 100 ft. wide industrial facility was constructed on schedule in 13 months. A 4,000 sq. ft. undercarriage wash system is attached to the structure to rid the snow equipment of any chemicals used in the snow removal process. This structure features a rubber roof, metal panel siding, and four large 24 ft. wide x 16 ft. high garage doors.
Projects
Pittsburgh International Airport Snow Removal Equipment Building
Explore
Project Info
Pittsburgh International Airport
PBS & J
54,000 SF
General Contractor
Pittsburgh
, PA