Mini Storage Depot – Stonecrest

Scope

This new three-level 102,000 sq. ft. pre-engineered metal building (PEMB) is composed of brick, EIFS, metal wall panels, cold formed metal stud framing, sliding glass doors, tempered glass windows, and standing seam metal roof. Building interior features climate-controlled storage units with exterior accessible units, stained concrete, cold formed metal stud framing, metal wall panels, metal base, and finishes. Site work consisted of concrete sidewalks/curbs, bollards, and paving/striping. There is also a 7,400 sq. ft. additional covered parking area composed of brick, CMU, EIFS, and standing seam metal roof.

Explore

Project Info

The Sterling Group

H2A Corporation

102,000 SF

General Contractor

Stonecrest

, GA