This new three-level 102,000 sq. ft. pre-engineered metal building (PEMB) is composed of brick, EIFS, metal wall panels, cold formed metal stud framing, sliding glass doors, tempered glass windows, and standing seam metal roof. Building interior features climate-controlled storage units with exterior accessible units, stained concrete, cold formed metal stud framing, metal wall panels, metal base, and finishes. Site work consisted of concrete sidewalks/curbs, bollards, and paving/striping. There is also a 7,400 sq. ft. additional covered parking area composed of brick, CMU, EIFS, and standing seam metal roof.
Projects
Mini Storage Depot – Stonecrest
Explore
Project Info
The Sterling Group
H2A Corporation
102,000 SF
General Contractor
Stonecrest
, GA