Proudly Celebrating 35 Years in Business!

Projects

Holistic Industries Cannabis Cultivation & Processing Center – Beaver

Scope

This former automotive parts warehouse was transformed into a new medical cannabis cultivation, grow, and processing facility. This 62,000 sq. ft. single-story facility consists of flower, veg, MOM, prop, dry, trim, vault, extraction lab, locker rooms, and a cafeteria area. The scope included installation of the fertigation/RO/water treatment systems, CO distribution throughout, LED grow lighting, benching and racking systems, labs, extraction, explosion-proof rooms, and all air circulation equipment. Rycon completed all of the low voltage and communication wiring for the mechanical, electrical, IT, and security systems. Coordination was required with the Owner’s BMS vendor for all low voltage wiring.

Explore

Project Info

Holistic Industries/Franklin Street/Vega Strategic Ventures

MJ12 Design Studio

62,000 SF

Construction Manager

Beaver

, WV
Scroll to Top