This former automotive parts warehouse was transformed into a new medical cannabis cultivation, grow, and processing facility. This 62,000 sq. ft. single-story facility consists of flower, veg, MOM, prop, dry, trim, vault, extraction lab, locker rooms, and a cafeteria area. The scope included installation of the fertigation/RO/water treatment systems, CO distribution throughout, LED grow lighting, benching and racking systems, labs, extraction, explosion-proof rooms, and all air circulation equipment. Rycon completed all of the low voltage and communication wiring for the mechanical, electrical, IT, and security systems. Coordination was required with the Owner’s BMS vendor for all low voltage wiring.
Projects
Holistic Industries Cannabis Cultivation & Processing Center – Beaver
Explore
Project Info
Holistic Industries/Franklin Street/Vega Strategic Ventures
MJ12 Design Studio
62,000 SF
Construction Manager
Beaver
, WV