This 141,000 sq. ft. warehouse distribution facility is being constructed on 60 acres with an extensive site work package including sidewalks, curb, landscaping, utilities, electrical vehicle (EV) charging stations, truck unloading, delivery van parking/staging/loading, as well as a specifically designed traffic pattern.
Spread footings, concrete slab-on-grade, precast concrete, insulated metal wall panels, structural steel, joist and deck, TPO roof, aluminum storefronts, and metal wall panels will makeup the structure.
The facility will include 15 new truck docks (33 future knock-outs), service space, warehouse, entry screening, offices, staging, and locker/break room/restrooms. Electrical work consists of electrical gear and panels, lighting, and power distribution for end user equipment. The mechanical package includes RTUs ranging in size from four (4) nominal tons to 15 nominal tons with associated infrastructure.
Construction will be completed on an aggressive fast-track schedule.